20LTR bucket mould moldes de blade 20 litros

20LTR bucket mould moldes de blade 20 litros

  • 20LTR bucket mould moldes de blade 20 litros
  • 20LTR bucket mould moldes de blade 20 litros
  • 20LTR bucket mould moldes de blade 20 litros
Unit Price: USD 28000 pc  Get Latest Price
Model No.: SM-12001
Min. Order: 1 set
Packaging: Strong Wooden Box
Delivery Time: 50 Days
Place of Origin: China
Brand: SHINY MOULD
Certificate: ISO9001, SGS

Product Description

20LTR bucket mould/ moldes de blade 20litros

 

Cavity No.: Single cavity bucket mould
Mould dimension: 600*600*650mm
Injection gate: Cold runner direct gate
Mould steel: P20 mould steel, with nitriding heat treatment. 
Injection machine: 650T Haitian Machinery
Cycle time: 28s
Delivey time: 45 days for the first sample, 60 days for shipment
Payment terms: 50% advance payment, the balance will be paid before shipment. 


PROCESS: 
1. Quote competitive price according customer detail requirement. 
2. Sign agreement
3. Customer T/T deposit to us to start to design mould
4. Send mould drawing to customer for confirmation
5. Mould design confirmed and start to make mould
6. Make mould trial during tooling time(which we get agreement with customer)
7. Send mould trial sample to customer forinspection, or customer come to our factory to inspect mould personally
8. Customer T/T balance to us after mould confirmed
9. Deliver mould after get balance

BUCKET MOULD PHOTOS

 

 

 

 

 

 GENERAL INFOMATION ABOUT MOULD COMPONENTS:

The advantage of using standard mould components include:

1. shorter mould construction lead time

2. increased machining capacity in house

3. ease of mould maintenance

4. reduce mould downtime

5. reduce te overall long-term costs.

 

 

The main disadvantage concerned wih the use of standard mould components tends to be associated with the following:

1. reliance upon one specific source of supply.

2. failure to supply on time. It's a rare occurrence with most suppliers, but it should be considered the delivery time quoted by supplier and place order on time.

3. mistakes in part ordering caused longer mould downtime.

 

Standard parts system is divided into two general groups:

1. standard mould base system

2. accessory components, like ejection, slide, cooling and so on.

Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-3000 characters
Post Sourcing Request >>